Gangway for Taiyuan Metro Line 1 and Line 2

Project Highlights

The first phase project of Taiyuan Metro Line 1 starts from Xishan Mining Administration Station in the west and ends at Wusu Airport Station in the east, spanning multiple important areas in Taiyuan. The total length of the line is approximately 28.7 kilometers, with a total of 24 stations, including 23 underground stations and 1 elevated station.

 

Taiyuan Metro Line 1 adopts a series of advanced technologies to bring passengers a safe, comfortable and efficient travel experience. In terms of train operation, it is equipped with a high-precision automatic control system. It can automatically adjust the train's running speed and departure interval according to the real-time passenger flow situation, ensuring that passengers can be quickly evacuated even during peak hours and reducing waiting time. During off-peak hours, it can also rationally optimize operational resources, reducing energy consumption and operating costs.

 

Chongqing Yoggui’s gangway system has been installed on the Taiyuan metro line and line 2 It plays an important role in ensuring the safe operation of the train. When the train is running, the carriages may experience vibrations and positional shifts due to acceleration, deceleration and turning. The articulated gangway system can flexibly adapt to these changes and maintain a stable and continuous connection. It also helps to reduce the transmission of noise and vibration between carriages, creating a more comfortable riding environment for passengers. The following are the main parameter of the A-type train articulated gangway.


Gangway for Taiyuan Metro Line 1 and Line 2

Gangway for Taiyuan Metro Line 1 and Line 2

Email: xukezhong@yonggui.com
Phone: +86 133 5002 3063
Mr Tan: +86 130 3566 0155 Mr Bob:+86 150 0818 5663